Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid PV installation at the Sangpang Health Post in the Bhojpur District. The post is the primary care facility for more than 3,500 residents in a part of Koshi Province where local power conditions are significantly challenged.
We managed the in-country delivery — logistics, installation, commissioning, and ongoing support. The system provides a stable supply for the post’s essential medical loads, taking the unreliable grid out of the critical path.







