Humla District Hospital — Simikot
Peak Power partnered with UNICEF on an 18kW hybrid solar-diesel system at Humla District Hospital in Simikot, powering critical care, cold chain and essential loads for one of Nepal's most remote district hospitals.
View project
Charang Health Post — Upper Mustang
Peak Power partnered with UNICEF on an 18kW hybrid solar-diesel installation at Charang Health Post in Upper Mustang, Nepal, powering essential lighting, diagnostics and emergency services for this remote high-altitude community.
View project
Gokuleshwor Primary Health Care Centre — Darchula
Peak Power partnered with UNICEF Nepal on an 18kW hybrid solar-diesel system at Gokuleshwor Primary Health Care Centre in Darchula, a regional care hub serving thousands of residents in far-western Nepal.
View project
Barabise Primary Health Care Centre — Sindhupalchok
Peak Power partnered with UNICEF on an 18kW hybrid solar-diesel system at Barabise Primary Health Care Centre in Sindhupalchok, part of a wider UNICEF programme strengthening 12 key health facilities across Nepal.
View project
Dolpa District Hospital
Peak Power partnered with UNICEF Nepal on an 18kW hybrid solar-diesel system at Dolpa District Hospital, the primary medical hub for Dolpa district, reached via a five-day overland route through Karnali Province.
View project
Mugu District Hospital
Peak Power partnered with UNICEF on an 18kW hybrid solar-diesel system at Mugu District Hospital, one of the most remote Himalayan facilities in Nepal, serving a district population of over 55,000.
View project
Gorkha District Hospital
Peak Power partnered with Sunshine Energy and AEPC on a 50kW hybrid solar system at Gorkha District Hospital, re-engineering the electrical network to raise energy autonomy and reduce diesel dependence.
View project
Raskot Community Hospital — Kalikot
Peak Power partnered with Motherland Energy Group on a 30kW hybrid solar system for Raskot Community Hospital in Kalikot, replacing aging diesel-heavy infrastructure at this essential non-profit facility.
View project
Bahunipati Clinic
Peak Power partnered with Dhulikhel Hospital on a hybrid solar system for Bahunipati Clinic, stabilising power for medical and IT systems where the grid couldn't deliver consistent voltage.
View project
Phalebas Clinic
Peak Power installed a hybrid solar system at Phalebas Clinic to provide a stable AC supply in an area where grid voltage regularly dropped below what's needed for medical equipment.
View project
Manekharka Clinic
Peak Power installed a hybrid SMA AC-coupled solar system with high-capacity battery storage at Manekharka Clinic, later extended with additional solar and inverter capacity.
View project
Dorpu Clinic
Peak Power delivered a hybrid solar system and full electrical remediation at the high-altitude Dorpu Clinic, including a dedicated 3-phase circuit for X-ray diagnostics.
View project
Kartike Daurali Clinic
Peak Power partnered with Dhulikhel Hospital on a 9kW solar installation at the Kartike Daurali outreach centre.
View project
Druk Pema Karpo Clinic
Peak Power engineered a custom low-noise solar system for the Druk Pema Karpo dental clinic in Ramkot, built to handle dental equipment's high inrush currents.
View project
Sangpang Health Post — Bhojpur
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Sangpang Health Post in Bhojpur, the primary care facility for more than 3,500 residents.
View project
Samsi Health Post — Mahottari
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Samsi Health Post in Mahottari, fixing a local power supply that had historically been too limited for medical operations.
View project
Gaushala Health Post — Mahottari
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid PV system at Gaushala Health Post in Mahottari, stabilising healthcare infrastructure for a regional hub of around 72,000 residents.
View project
Tahu Health Post — Palpa
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Tahu Health Post in Palpa District, serving nearly 4,000 residents in Nepal's Lumbini province.
View project
Thoche Health Post — Manang
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Thoche Health Post, an Annapurna Circuit stopover at 1,860m serving both the local community and trekkers.
View project
Humde Health Post — Manang
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Humde Health Post, one of Nepal's highest inhabited settlements at around 3,290 metres.
View project
Olane Health Post — Panchthar
Peak Power partnered with GSOL (Denmark) and UNICEF on a 24/7 hybrid solar system at Olane Health Post in Panchthar, replacing mobile-phone lighting for medical procedures.
View project
Tellok Health Post — Taplejung
Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid solar system at Tellok Health Post in Taplejung District, serving nearly 400 households in Koshi Province.