Peak Power partnered with GSOL (Denmark) and UNICEF on a hybrid PV installation at the Tahu Health Post in the Palpa District. The post serves a population of nearly 4,000 residents in a part of Lumbini known for difficult terrain and weak local power.
We handled end-to-end delivery: logistics, installation, and commissioning. The hybrid system gives the post a stable supply for its essential medical loads — a clean, quiet alternative that works with the surroundings rather than against them.





