Large SystemsLarge Systems

Industrial Factory

Kathmandu, Bagmati

A printing and packaging industry in Kathmandu was running extensively from Diesel Generators and was looking for a way to reduce costs and boost power reliability.

This power system enabled the factory to run during the day from AC Coupled PV, this eliminated interruptions to productivity from constant AC source change-overs, reduced wear and runtime of diesel gensets and lowered grid consumption overall.

Interestingly this was the first SMA Multicluster 36 based system in Nepal.